Crispus Attucks York African American History and Culture Center Coming Soon to York, PA

Exciting progress is happening at the Crispus Attucks York History & Culture Center!

Interior Progress

Inside the building, drywall installation is complete, and teams have shifted their focus to painting and ceramic tiling. With permanent power now connected, preparations are underway for elevator installation, scheduled to begin in mid-December.

Looking ahead, the installation of metal wall panels and the curtain wall system is planned for the December–January timeframe.

Exterior Updates

Outside, work is focused on creating a welcoming and functional space. The front parking lot and sidewalk have been removed to make way for the new layout. A brick platform for logo signage has been erected at the new entrance, and soon, the logo will be applied to complete this striking feature.

Crispus Attucks York African American History and Culture Center Coming Soon to York, PA

In the garden area, the pathways that wind through the space have been drafted, shaped, and the concrete poured. These paths will feature inspiring quotes to enhance the garden’s beauty and purpose. Work has also begun on the brick walls that will frame this serene space.

https://crispusattucks.org/wp-content/uploads/2024/12/IMG_1863-2.jpg
https://crispusattucks.org/wp-content/uploads/2024/12/IMG_1853-2.jpg
https://crispusattucks.org/wp-content/uploads/2024/12/IMG_0998.jpg
https://crispusattucks.org/wp-content/uploads/2024/12/IMG_0996.jpg
https://crispusattucks.org/wp-content/uploads/2024/12/IMG_0995.jpg
https://crispusattucks.org/wp-content/uploads/2024/12/IMG_0993.jpg
IMG_0993

Stay tuned for more updates as we bring this vision to life!

Share This Story